IEBC2018 PDF 下载

International Existing Building Code (IEBC) 2018 PDF Free Download/下载

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. For the most current adoptions details go to International Code Adoptions

Key changes include:

  • Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a reorganization and new chapter numbering.
  • Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods.
  • Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC.
  • A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC.
  • When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along reinforced concrete and masonry walls.
  • Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on IBC-level forces.
  • When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and structures.
  • Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter.
  • Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in Additions for I-1, I-2, I-4 and R Occupancies.
  • Emergency Escape and Rescue Opening provisions related to being operational have been added to Prescriptive Compliance Method and Alterations Level 1.
  • Single exit buildings and spaces under Alteration Levels 2 and 3 have been modified to be more consistent with the IBC.
  • The Alterations Level 2 requirement that water for automatic fire sprinkler system be available at the floor of alteration without the need for a fire pump has been moved to Chapter 9 for Alterations Level 3 and the fire pump criterion was deleted.
IEBC2018 PDF 下载
IEBC2018 PDF 下载
下载权限
查看
  • 免费下载
    评论并刷新后下载
    登录后下载
  • {{attr.name}}:
您当前的等级为
登录后免费下载登录 小黑屋反思中,不准下载! 评论后刷新页面下载评论 支付以后下载 请先登录 您今天的下载次数(次)用完了,请明天再来 支付积分以后下载立即支付 支付以后下载立即支付 您当前的用户组不允许下载升级会员
您已获得下载权限 您可以每天下载资源次,今日剩余
本站所有资源,均收集于互联网,如若本站内容侵犯了原著者的合法权益,可联系我们进行下架处理。

给TA赞赏
共{{data.count}}人
人已赞赏
ISO

IECC 2018 PDF下载

2025-11-8 10:18:52

ISO

IRC2018 PDF 下载

2025-11-8 10:07:25

0 条回复 A文章作者 M管理员
    暂无讨论,说说你的看法吧
个人中心
今日签到
有新私信 私信列表
搜索